價(jià)格: 電議
物流: 浙江 杭州市 江干區(qū)| 賣家支付運(yùn)費(fèi)
可銷售總量: 999件
手機(jī): 18158534953 郵箱: info@manntek.cn
傳真: 0571-87695113 地址: 浙江 杭州市
[LNG加液設(shè)備 LNG儲(chǔ)運(yùn)系統(tǒng) LNG液化氣體運(yùn)輸 LNG設(shè)備配件]
郵箱:
手機(jī):
Hose break system/fall arrest This friction device will maintain a constant rate of descent of the hose following activation of the PERC following an ESD2. Once it has reached its full extent, the rope will‘breakaway’from the friction device. Other accessories MannTek offers a variety of other extra features, such as: ? Hose Lifting Device ? Hose Protection Covering ? Insulation Flanges ? Hose Reels ? Adjustable N2 Trigger Hoses ? N2 Purge Lines Heated pang device Heated pang device is used to easily defrost and dry the hose unit after LNG transfer operation. The heated pang device ensures that the hose unit will be ready for transfer operations again within minutes. 更多MannTek曼太柯產(chǎn)品詳情,歡迎訪問曼太柯(杭州)流體設(shè)備有限公司官方網(wǎng)站:https://www.manntek.cn,詢盤電話:0571-87695112,期待您的關(guān)注與訪問。
安全拉斷閥 球閥 旋轉(zhuǎn)接頭 干式快速接頭 工業(yè)軟管 膨脹節(jié)
注冊(cè)資金:100萬-500萬
聯(lián)系人:徐小姐
固話:0571-87695112
移動(dòng)手機(jī):18158534953
企業(yè)地址:浙江 杭州市 江干區(qū)